Home Tags Network Rail

Tag: Network Rail

Onibury level crossing. Photo: Network Rail

Shropshire residents invited to find out more about level crossing safety

Users of Wem and Onibury level crossings in Shropshire are invited to find out more about level crossing safety, following reports of misuse and concerns raised by people in the communities.
Refurbishment work is due to begin on the Dana Footbridge in Shrewsbury. Image: Google Street View

Work to begin on Dana footbridge refurbishment

Work to refurbish the Dana Footbridge in Shrewsbury will begin on Friday 14 December, with the bridge closing to pedestrians.
The first phase of work to upgrade Shrewsbury Station was completed in late 2016 and involved renewing the large canopy roof over platforms 3, 4 and 7

Second phase of upgrade work at Shrewsbury railway station scheduled to begin

The second phase of upgrade work at Shrewsbury railway station is due to begin next month.
Craven Arms Railway Station. Photo: Network rail

Disruption for passengers as Craven Arms railway upgrade begins this weekend

Train passengers are being urged to check before travelling between Shrewsbury and Newport as Craven Arms railway upgrade begins this weekend.
The existing rail through Hanwood is being replaced to ensure the continued safe operation of the railway

Network Rail to spend £200k on rail replacement through Hanwood

Network Rail is spending £200k to replace rail on the Cambrian Line through Hanwood next month.

Baschurch level crossing closed after car collides with barrier

The level crossing in Baschurch is closed to vehicles after a car collided with the barrier.
Upgrade work has been completed at Onibury level crossing. Photo: Network Rail Wales

A49 reopens as Onibury level crossing upgrade is completed

The A49 at Onibury was reopened last night following the completion of improvement work at Onibury level crossing.
Onibury level crossing. Photo: Google Street View

A49 closed at Onibury as level crossing upgrade begins

Network Rail has today begun essential upgrade work at Onibury level crossing closing the A49 to traffic.
The new bridge deck being installed at Albrighton station. Photo: Network Rail

Railway reopens after bridge upgrade at Albrighton

The railway between Telford and Wolverhampton has reopened after bridge replacement work was successfully completed on time.
The bridge on which Albrighton station is located. Photo: Google Streetview

Albrighton station closes for bridge replacement work

Albrighton station will be closed from today for two weeks while Network Rail replaces a bridge.
The first phase of work to upgrade Shrewsbury Station was completed in late 2016 and involved renewing the large canopy roof over platforms 3, 4 and 7

First phase of upgrade work to Shrewsbury station completed

The first phase of work to upgrade Shrewsbury station has been completed as part of Network Rail’s Railway Upgrade Plan.

Weekend train services to resume between Newport and Shrewsbury following railway upgrade work

Passengers have been thanked for their patience following the completion of railway upgrade work between Newport and Shrewsbury.
Advertisement

Weather

Shropshire
scattered clouds
7 ° C
8.3 °
5.6 °
87 %
3.1kmh
47 %
Fri
11 °
Sat
9 °
Sun
12 °
Mon
14 °
Tue
11 °
Advertisement
Advertisement

Latest Articles

Advertisement