Home Tags Network Rail

Tag: Network Rail

Refurbishment work progresses at Dana footbridge in Shrewsbury. Photo: Network Rail

Dana footbridge refurbishment to be completed by November

Work to refurbish the Dana footbridge in Shrewsbury is set to be completed by November.
The surface of Whittington level crossing is to be upgraded. Photo: Network Rail

Surface upgrade work to take place at Whittington level crossing

Work is to take place to upgrade the surface of Whittington level crossing later this summer.
Heritage locomotive Clun Castle will be steaming into Ironbridge this Sunday. Photo: Vintage Trains

Rail enthusiasts urged to stay safe as heritage locomotive steams to Ironbridge

Steam fans are being warned to keep a safe distance from a rarely used railway line in Ironbridge this weekend when heritage locomotive Clun Castle makes a special visit.
Onibury level crossing. Photo: Network Rail

Shropshire residents invited to find out more about level crossing safety

Users of Wem and Onibury level crossings in Shropshire are invited to find out more about level crossing safety, following reports of misuse and concerns raised by people in the communities.
The Dana Footbridge in Shrewsbury before refurbishment work began. Image: Google Street View

Work to begin on Dana footbridge refurbishment

Work to refurbish the Dana Footbridge in Shrewsbury will begin on Friday 14 December, with the bridge closing to pedestrians.
The first phase of work to upgrade Shrewsbury Station was completed in late 2016 and involved renewing the large canopy roof over platforms 3, 4 and 7

Second phase of upgrade work at Shrewsbury railway station scheduled to begin

The second phase of upgrade work at Shrewsbury railway station is due to begin next month.
Craven Arms Railway Station. Photo: Network rail

Disruption for passengers as Craven Arms railway upgrade begins this weekend

Train passengers are being urged to check before travelling between Shrewsbury and Newport as Craven Arms railway upgrade begins this weekend.
The existing rail through Hanwood is being replaced to ensure the continued safe operation of the railway

Network Rail to spend £200k on rail replacement through Hanwood

Network Rail is spending £200k to replace rail on the Cambrian Line through Hanwood next month.

Baschurch level crossing closed after car collides with barrier

The level crossing in Baschurch is closed to vehicles after a car collided with the barrier.
Upgrade work has been completed at Onibury level crossing. Photo: Network Rail Wales

A49 reopens as Onibury level crossing upgrade is completed

The A49 at Onibury was reopened last night following the completion of improvement work at Onibury level crossing.
Onibury level crossing. Photo: Google Street View

A49 closed at Onibury as level crossing upgrade begins

Network Rail has today begun essential upgrade work at Onibury level crossing closing the A49 to traffic.
The new bridge deck being installed at Albrighton station. Photo: Network Rail

Railway reopens after bridge upgrade at Albrighton

The railway between Telford and Wolverhampton has reopened after bridge replacement work was successfully completed on time.
Advertisement

Weather

Shropshire
scattered clouds
19.7 ° C
21.1 °
17.8 °
55 %
7.2kmh
40 %
Sat
19 °
Sun
17 °
Mon
16 °
Tue
18 °
Wed
18 °
Advertisement
Advertisement

Latest Articles

Advertisement